
Modern Luxury Residence
We rebuilt the primary ensuite and 2 further bathrooms in a whole-house renovation; the stone, the brass and the lighting carry through the house.
Toronto, North York, Etobicoke and York Region
A bathroom concentrates every trade into a small room: plumbing rough-in, waterproofing, tile, glass, brassware and lighting. Doing several bathrooms at once keeps the trades on one schedule and the house in one period of disruption.


We rebuilt the primary ensuite and 2 further bathrooms in a whole-house renovation; the stone, the brass and the lighting carry through the house.

Renovation and rear addition
The primary bath under its skylight, 2 further baths and a powder room, built as part of the whole-home renovation.

The stone bathrooms of a penthouse in Toronto, in a full remodel with architectural European finishes.
The brassware is chosen first, because the plumbing rough-in follows the maker's dimensions. Changing the brassware after the walls are closed means opening them again.
A membrane behind every shower and pan, then tile set by a specialist tile setter, not a generalist.
Frameless glass, stone or porcelain on the vanity, a lit mirror or niche, and heated floors where the room asks for them.
Bathroom work often pairs a primary ensuite with the other bathrooms in the house, as at the Modern Luxury Residence, where we rebuilt 3 bathrooms.
The Real Cost of Renovating in Toronto, 2026 edition, gives ranges for a bathroom renovation from $20,000 to $35,000 at Standard, $35,000 to $70,000 at Mid and $70,000 to $110,000 and up at Premium, before HST. These are our planning ranges for Toronto in 2026. They are not quotes. Relocated plumbing, slab stone, steam or wet room construction and custom millwork move a bathroom into the top band. After a site visit, the scope and the price are set out in writing before work begins.
Usually, yes, if another bathroom stays in service. We plan the sequence so that 1 bathroom works at every point. When you stay in the house, we seal off the work area completely and keep dust under control throughout. Safety comes first.
It depends on the scope and on the lead time of the fittings and stone. We do not publish a standard figure; your own schedule is set out at the design and pricing stage.
Specialist tradespeople in each trade, with Leonid overseeing structural coordination, site inspections, and the trades responsible for bringing each project to completion. On every project, an owner or partner is on site daily, and you receive weekly photo updates.
At the showroom in North York, or by video if you cannot come in. Bring photographs or drawings of your house, or nothing at all.
Call 647 531 2900 or write to info at lemanconstruction.com.