Cost per square foot in Toronto, 2026.

Last reviewed October 2026.

Everyone asks for the number. These are the ranges for renovations, additions and basements in 2026, with what each band buys and what sits outside it. These are our planning ranges for Toronto in 2026. They are not quotes. A site visit, a written scope and, where needed, drawings lead to a project estimate.

A rate is a planning band, not a price.

A per square foot rate compresses hundreds of decisions about structure, finishes and site conditions into a single figure. 2 honest contractors can quote rates that differ by 50 percent and both be correct, because they are imagining different projects. The ranges below are useful for early planning: place your project in a band honestly, multiply by your real area, and carry the whole range into your budget rather than keeping only the low number. What they cannot do is price your house. That takes a walkthrough, drawings and a scoped estimate.

Whole home renovation ranges.

A general interior renovation keeps the structure largely as it is. A full gut takes the house back to the frame and replaces the systems throughout. The 2 are different products at different prices.

General interior renovation
Level.Toronto planning range per square foot.What that level typically buys.
Standard.$100 to $160 per sq ft.Cosmetic scope, finishes refreshed, kitchens and bathrooms updated, no structural change.
Mid.$160 to $230 per sq ft.Selective layout changes, quality finishes throughout, partial mechanical upgrades.
Premium.$230 to $300 and up per sq ft.Extensive layout changes, premium finishes and millwork, lighting design, upgraded systems.
Full gut renovation
Level.Toronto planning range per square foot.What that level typically buys.
Standard.$350 to $450 per sq ft.Full systems replacement, quality standard finishes, limited structural reconfiguration.
Mid.$450 to $550 per sq ft.Reconfigured floor plans, structural openings, custom kitchens and bathrooms, quality finishes throughout.
Premium.$550 to $700 and up per sq ft.Architectural design, custom millwork through the house, European finishes, integrated systems, heritage detailing where applicable.

For orientation: a 2,200 square foot full gut at mid range pricing of $450 to $550 per square foot lands between $990,000 and $1,210,000 before HST and soft costs.

Additions and third storeys.

Additions price above renovations because every square foot includes foundation or structural work, envelope and roof, plus the tie in to the existing house. The rate applies to the new area only.

Addition, rear or side
Level.Toronto planning range per square foot.What that level typically buys.
Standard.$350 to $500 per sq ft.Simple footprint, straightforward foundation, standard finishes.
Mid.$500 to $600 per sq ft.Larger spans, kitchen or bathroom inside the addition, quality finishes.
Premium.$600 to $750 and up per sq ft.Complex structure, extensive glazing, premium finishes, significant tie in work to the existing house.
Third storey addition
Level.Toronto planning range per square foot.What that level typically buys.
Standard.$450 to $550 per sq ft.Structure cooperates, simple roof form, standard finishes.
Mid.$550 to $650 per sq ft.Reinforcement of existing structure, new principal suite with bathroom, quality finishes.
Premium.$650 to $800 and up per sq ft.Underpinning or major reinforcement, complex roof, premium suite and finishes.

Basement renovation ranges.

Basement renovation
Level.Toronto planning range per square foot.What that level typically buys.
Standard.$65 to $95 per sq ft.Finishing an already dry, adequate height basement with standard finishes.
Mid.$95 to $145 per sq ft.New bathroom, wet bar or kitchenette, quality finishes, improved insulation and lighting.
Premium.$145 to $200 and up per sq ft.Full design treatment, custom millwork, theatre or gym buildouts, premium finishes.

Underpinning or benching to gain ceiling height is priced separately and commonly adds between $50,000 and $150,000 depending on foundation type and waterproofing scope. Separate entrance and secondary suite conversions add code requirements that move the range upward.

5 things drive cost.

  1. Structure.

    Removed walls, new openings, underpinning and steel all sit in the invisible half of the budget. 2 identical looking renovations can differ by hundreds of thousands here.

  2. Finishes.

    The distance between standard grade and full custom millwork with slab stone is the single widest variable in any range.

  3. Mechanical systems.

    New HVAC, electrical service upgrades and plumbing relocation move the number well before anything visible is installed.

  4. Site conditions.

    Tight streets, shared walls, mature trees and older foundations never show up in a per square foot rate and always show up in the final cost.

  5. Permits and approvals.

    Committee of Adjustment variances, heritage review, and ravine or tree protection add fees, professional time and months of carrying cost.

What the ranges include, and what they do not.

The figures above are construction cost. The cost of the project is larger, and most renovation budgets fail because the items around the quote were never counted.

HST.
Renovation contracts in Ontario carry 13 percent HST, and published ranges, including these, exclude it. On a $500,000 project that is $65,000. Budget in HST inclusive numbers, because that is the cheque you will actually write.
Contingency.
For renovations of older Toronto homes, carry 10 to 20 percent of the construction cost, with the higher figure for houses from before 1950. The correct way to think about contingency: it is a reserve in your own budget, and whatever you do not need stays yours.
Design and engineering fees.
Design and engineering for a significant renovation typically run 10 to 15 percent of construction cost in the Toronto market: the architect or designer, the structural engineer, HVAC design and surveys. A full-service architect on a complex project can run higher on its own.
Permit fees.
City of Toronto building permit fees are charged by floor area. On the 2026 schedule they run from a few hundred dollars on a contained interior renovation to a few thousand dollars on a large addition. Most permits also need a road damage deposit of about $3,400, most of it refundable once the work is done. A Committee of Adjustment application adds a fee of about $2,200, a planner or designer to prepare the submission, and often months of carrying costs while you wait.
Temporary housing.
Temporary housing during a full gut is a 5 figure line item of its own.

Why premium work costs what it costs.

The ranges widen at the top. Premium construction removes the hiding places: flush millwork, shadow gaps, slab stone with mitred edges and minimal trim all demand substrate work that is flat and true to a few millimetres, which makes the budget heavier even in the invisible trades. European cabinetry and natural stone are procured months ahead, often from overseas, with no local replacement if anything arrives wrong. And a premium project simply contains more decisions per square foot. What the top of the range buys is time: slower, more careful site work.

Questions.

  1. What does a renovation cost per square foot in Toronto in 2026?

    A general interior renovation runs roughly $100 to $300 per square foot depending on scope and finish level. A full gut renovation, taken back to the structure with new systems throughout, runs roughly $350 to $700 per square foot and up at Premium. These are our planning ranges for Toronto in 2026. They are not quotes. A site visit, a written scope and, where needed, drawings lead to a project estimate for a specific house.

  2. Does the per square foot rate include the basement?

    No. Basement finishing is priced separately, roughly $65 to $200 per square foot depending on scope, and underpinning to gain ceiling height commonly adds between $50,000 and $150,000.

  3. Do published ranges include HST?

    No. Renovation contracts in Ontario carry 13 percent HST and most published ranges exclude it. On a $500,000 project that is $65,000. Design fees, permits, contingency and appliances usually sit outside the construction quote as well, which is why the budget conversation must happen in all in numbers.

  4. Why do 2 quotes for the same project differ so much?

    Usually because they include different things. One quote covers design coordination, allowances and site protection; the other covers construction labour and little else. Ask for the exclusions list in writing before comparing totals. A quote far below the bottom of a market range deserves more suspicion than one near the top.