Skip to content

Concord Office

Type of work
Office fit-out and second floor addition
Place
Concord, Vaughan
Built
2021
Starting point
An empty concrete shell.
Role
General contractor and project manager.
Photographs
Leman Construction.

An office built out from an empty concrete shell in Concord, including a second floor addition. We ran the project as general contractor, from framing, drywall and ceilings through mechanical, electrical, fire separation and inspections.

The brief.

Take an empty concrete shell and hand back a finished office that people could occupy, with a second floor added inside the unit and every trade coordinated by a single contractor.

What we did.

We acted as general contractor and project manager for the tenant fit-out. The unit was an empty concrete shell, and the scope was full interior construction to a finished, occupiable office, including a second floor addition. The work covered general contracting and site supervision, all the subcontracted trades, framing, insulation, drywall, doors and hardware, ceilings, painting, flooring and millwork, the mechanical and HVAC work, plumbing, electrical with the electrical safety inspections, fire and life safety including fire rated assemblies and fire stopping, and the municipal inspections and deficiencies. The work also covered concrete cutting and pouring for the plumbing, glass partitions by a partition specialist, T-bar ceilings, carpet and vinyl tile, tile in the lobby and the stair, the washrooms, the kitchen and coffee station cabinets and an accessible door opener.

The hard part.

A concrete shell gives you nothing: no walls, no services, no second floor. Everything in the finished office had to be designed in, from cutting the slab for the plumbing to the fire rated assemblies that let 2 storeys share the unit, and the municipal and electrical safety inspections were part of the work.

The rooms.

IThe stair up to the second floor addition, tiled treads and twin handrails.
IIThe corridor along the frosted glass partitions, set by a partition specialist.
IIIThe black ceiling with its exposed ducts and a round pendant: the mechanical work left honest.

Next project

Holy Perogy

Restaurant fit-out. 2018 to 2019.

Restaurant dining room under a slatted timber ceiling: 3 wire cage pendants before a wall of timber fins over painted bands, long tables and chairs, open shelving on a teal wall at the left

Start with a first meeting.

At the showroom in North York, or by video if you cannot come in. Bring your floor plan, your drawings and your move-in date.

Call 647 531 2900 or write to info at lemanconstruction.com.