A whole-home renovation takes the inside of a house back to its structure and rebuilds it: the systems, the stair, the rooms and the finishes, as one piece of work. It is the most demanding kind of renovation we do, and the kind that most often changes how a house lives. It is also the kind where the order of the work matters most, because each stage sets up the next.
Every Leman project moves through the same 6 stages, each one named and shared with you before work begins. This article follows a whole-home renovation through them: what happens, what you receive and what you decide at each one.
Discovery.
Discovery starts with a first meeting, at our showroom in North York, or by video if you cannot come in. Then we walk the house with you, at no charge, before any contract. For a whole-home renovation the walk looks past the finishes to the structure and the systems: which walls carry load, what the basement allows, and what the plumbing, the electrical and the heating can still do.
You leave discovery with our site notes, a first budget range and, if the project calls for design work, a design fee proposal. What we ask of you is a decision, without pressure, about whether to go on to design.
Design and pricing.
The design takes shape with your architect or designer, or one we bring in. For a whole house this is where the plan is settled: which walls move, where the stair goes, and how the kitchen, the bathrooms and the bedrooms sit on each floor. Structural and mechanical engineering, supplier sourcing and permit drawings happen at this stage, and the scope is priced from an itemized estimate.
Once you sign with us, we prepare 3D and photorealistic renderings of the main rooms in house, included in the project, with up to 2 rounds of changes. You see the layout and the finishes before work begins. The stage ends with the design package, the permit drawings and a contract that sets out the scope and the price in writing before work begins.
Permits and schedule.
We file the permits, book the tradespeople, confirm the lead times for finishes that travel, and lock the schedule. For a whole-home renovation the permit path depends on the house. An addition that does not fit the zoning needs a minor variance from the Committee of Adjustment, a lot beside a ravine adds a conservation authority review, and a house that is listed or sits in a heritage conservation district has a longer path. We plan for each of these at the design and pricing stage.
What we ask of you here is decisions on finishes, early enough that nothing waits on a delivery. European doors, slabs and hardware travel, and some are made to order.
Construction.
Construction follows an order. The structure comes first: where walls move or a basement goes down, the shoring, the underpinning, the new beams and the new openings come before anything else. At Hazelton Residence III the basement was lowered with underpinning behind soldier pile and lagging shoring.
Next come the systems. Plumbing, electrical, HVAC and insulation are replaced or extended while the walls are open. Then the spine of the house: the stair, the floors and the doors, which set its character. At the Modern Luxury Residence we replaced the staircase, laid new engineered floors with herringbone in the primary suite and hallway, and fitted 16 custom painted European doors. The rooms and the finishes come last: kitchen, bathrooms, millwork, tile, stone, lighting and paint, coordinated to one schedule so the long lead items arrive when the house is ready for them.
Most families move out for a whole-home renovation. When the systems and the stair are out, the house is a site. We will tell you at the first meeting whether your scope allows you to stay.
On every project, an owner or partner is on site daily, and you receive weekly photo updates. Leonid Nikolaev oversees structural coordination, site inspections and the trades. Larger projects also receive a written report every 2 weeks. Invoices follow the milestones in the contract, and work outside the written scope is priced in writing and goes ahead only once you approve that price.
Quality walk-through.
Before handover we walk the house with you and list every deficiency, then resolve the list. You receive the deficiency list, the completion log and the handover documents, and the final payment is due as the contract sets out.
One-year follow-up.
12 months after handover we come back for warranty work and a check-in. Our workmanship is under warranty for 1 year from handover, and the visit covers any settlement or seasonal repair work under that warranty. There is no payment attached to the visit and nothing to sign. This warranty is in addition to your rights under Ontario law.
What sets the length of the schedule.
There is no standard length for a whole-home renovation. A house that needs underpinning or a new addition takes longer, and so does a permit path with a minor variance, a ravine review or a heritage district. Finishes that are made to order add their lead times. Your own schedule is set out at the design and pricing stage, with the lead times for finishes built in.
Keeping it moving.
The most useful thing you can do is decide early. Settle the plan before the permit drawings, choose the finishes before the schedule is locked, and answer questions on site quickly when a choice comes up. Every decision made on paper is one that does not wait on the site.
If you are planning a whole-home renovation in Toronto or York Region, start with a first meeting at the showroom in North York, or by video if you cannot come in. Bring photographs or drawings of your house, or nothing at all.
Start with a first meeting.
At the showroom in North York, or by video if you cannot come in. Bring photographs or drawings of your house, or nothing at all.
Call 647 531 2900 or write to info at lemanconstruction.com.