Design-build or an architect and a contractor: how Toronto homeowners decide.

Before a renovation starts, you choose how it will be designed and priced. In Toronto, most homeowners take 1 of 2 routes: an architect or a designer first, with a contractor chosen once the drawings are done, or 1 team that carries the project from design through construction. Both routes can lead to an excellent result. They differ in who you hire first, when the price becomes firm, and who answers when the design and the budget pull in different directions.

Route 1: an architect first, then a contractor.

You hire an architect or an interior designer, who develops the design with you and prepares the permit drawings. Once the drawings are done, contractors price them, and you choose 1 to carry out the work. The designer stays independent of the contractor and can review the work on your behalf as it goes.

The strength of this route is a design developed on its own terms, and prices you can compare on the same drawings. The risk is timing: the design can run ahead of the budget before anyone who prices construction has seen it, and a design that comes back over budget means redesign, with its time and its fees.

Route 2: 1 team from design to construction.

In a design-build arrangement, 1 company leads the project from the first meeting to handover. It brings in the architect or the designer and the engineers, prices the design as it develops, files the permits and carries out the work. You sign with 1 company, and 1 company answers for the result.

The strength of this route is that cost informs the design from the start: a choice that costs too much is caught while it is still a drawing. The trade-off is that you see fewer independent prices, so the choice of company carries more weight. Ask to see finished projects of the kind you are planning, and ask how the price is set and when it becomes fixed.

A third way: bring the contractor in early.

Many projects sit between the 2 routes. You keep your own architect or designer, and you bring a contractor in during design rather than after it. The contractor prices the design as it develops and proposes alternatives where a detail costs more than it adds, while your designer keeps the lead on the design. You keep an independent designer on your side, and construction knowledge reaches the drawings before they are finished.

5 questions that decide it.

Do you already have an architect or a designer you trust? If you do, the first or the third route keeps that relationship at the centre of the project.

How firm is your budget? If the budget is the limit, get construction pricing into the design early, through the second or the third route.

How complex is the house? Structural work, a lot beside a ravine, a house in a heritage conservation district or an addition that needs a minor variance all add steps to the permit path. Whoever leads the design needs to plan for them before the drawings are final.

How much of the coordination do you want to carry? With separate contracts, you sit between the designer and the contractor when they disagree. With 1 team, that coordination is the company's job.

When do you need the price to be fixed? In every route, a price can only be fixed once the design is done. Before that, any number is a range.

How the price is set.

Whatever the route, a renovation is priced properly only once the design is done. An early budget, given before the design is done, is a range, not a fixed price. At Leman, once the design is done, renovations and fit-outs are priced from itemized written estimates, and the price for the written scope is fixed. Any work outside the written scope is priced in writing and goes ahead only once you approve that price in writing.

Permits and approvals.

The permit drawings come from the design team in both routes. An addition that does not fit the as of right envelope needs a minor variance from the Committee of Adjustment. A lot beside a ravine adds a conservation authority review on top of the building permit, and where a house is listed or sits in a heritage conservation district, the permit path is longer. The earlier these are known, the fewer surprises reach the schedule.

How we work in either route.

We work both ways. If your architect's drawings are ready, we price them as an itemized written estimate. When asked, we propose alternatives and value engineer the design at no extra charge. If you do not have an architect or a designer, we can bring one in. We work with reputable, highly experienced architects and designers we trust, and we have completed dozens of projects together.

Either way, every project runs through the same 6 stages: discovery, design and pricing, permits and schedule, construction, the quality walk-through and the one-year follow-up. Once you sign with us, we prepare 3D and photorealistic renderings of the main rooms in house, included in the project, with up to 2 rounds of changes. You see the layout and the finishes before work begins.

Before you choose.

Write down what you want the renovation to do, the budget you can commit and the date you are working to. Bring that, with photographs or drawings of your house, to a first meeting with any architect or contractor you are considering. A good first meeting leaves you with a clear next step and a first range for the budget, whichever route you choose.

Start with a first meeting.

At the showroom in North York, or by video if you cannot come in. Bring photographs or drawings of your house, or nothing at all.

Call 647 531 2900 or write to info at lemanconstruction.com.